Unit 2 Luton Retail Park - MetroBox

Pexhurst transformed a former Argos store into three modern, tenant-ready retail and leisure units.

Client:

MetroBox

Project Manager:

Hollis

Location:

Unit 2, Luton Retail Park

Value:

£1m - £2.5m

Programme:

23 Weeks

Pexhurst was appointed by Contracts Administrator Hollis, on behalf of MetroBox, to refurbish a former Argos store at Luton Retail Park, transforming the vacant unit into three separate retail spaces for restaurant and leisure occupiers. As the dominant out-of-town retail destination in the area, Luton Retail Park serves a wide catchment including the affluent towns of Hitchin, Harpenden, Redbourn and the surrounding areas of St Albans.

The project comprised the subdivision, alteration and comprehensive internal and external refurbishment of the existing retail unit to create three independent units, each with its own dedicated entrance and services.

Externally, the works included the removal of redundant entrance canopies, glazed wall cladding and roller shutter doors, together with the formation of new pedestrian entrances featuring glazed façades and automated bi-parting doors. Existing openings were infilled where required, while new apertures were created to suit the revised layouts.

Additional external works included the installation of new louvred retail signage and weathered louvres, repairs to the existing cladding and masonry, removal and infilling of rooflights, refurbishment of the existing metal roof and gutters, including external cleaning and redecoration.

Part of the substantial mezzanine installation for the new incoming tenant meant that piling was required to support the structure. However, despite pre-commencement surveys, when piling remains of a historic building footprint were discovered below ground, it made these works extremely difficult. After further investigations and design alterations, specialist casement piling was carried out to core through the obstructions whilst piling.

Internally, the existing tenant fit-out was stripped out entirely, except for the rear plant deck serving proposed Unit 2A. New partition walls were constructed to create the three separate units, including an enhanced acoustic separation wall between Units 2B and 2C.

A new structural steel mezzanine floor was installed within Unit 2C, alongside repairs to the existing floor slab, comprehensive fire-stopping works and full internal redecoration throughout.

The mechanical, electrical, plumbing and heating (MEPH) works involved the removal of all redundant building services before installing new infrastructure to support future occupiers.

This included energy-efficient temporary internal lighting, new external floodlighting, new water and foul drainage connections, alterations and upgrades to the existing gas and electrical supplies, new power connections to each unit ensuring the refurbished building were fully prepared for tenant fit-out out and all achieved EPC A ratings.